Exempted Developments (Section 5)
- Other relevant links
- Introduction To the Process
- Section 254 Licences
- Exempted Developments (Section 5)
- Housing Estates - Taking in Charge
- Planning Compliances
- Pre-Planning Meetings
- Large-scale Residential Developments (LRD)
- Strategic Housing Development (SHD) applications
Exempted Development (Section 5)
All development of land or property requires planning permission, unless it is classed as exempt.
Exempted development is development for which planning permission is not required. Categories of exempted development are set out in the Planning and Development Regulations 2001 as amended (Part 2 - Exempted Development Guidelines). They usually refer to developments of a minor nature, such as small extensions to houses, garden walls and so on.
Application Form for Exempt Development
Mar sin féin, má ta do mhaoin i Limistéar Caomhantais Ailtireachta, Ordú um Limistéir Taitneamhachta Speisialta, nó más struchtúr cosanta/foirgneamh liostaithe í ní bheidh feidhm ag ná díolúintí seo.
Alt 5 Dearbhú
De réir Alt 5 den Acht um Pleanáil agus Forbairt 2000 arna leasú déadfaidh duine ar bith Dearbhú a iarraidh maidir le cibé an bhfuil forbairt díolmahithe.
- Dearbhú Forbartha Díolmhaithe - Ba chóir Alt 5 a dhéanamh i scríbhinn (cóip chrua amháin) don Údarás Pleanála, chun a chinneadh an dteastaíonn cead ó thogra nó an meastar gur forbairt dhíolmhaithe é:
- Forbairtí Díolmhaithe - Alt 5
- An Roinn Pleanála
- Comhairle Chontae na Gaillimhe
- Áras an Chontae
- Cnoc na Radharc
- Gaillimhe
- H91 H6KX
- Ba chóir go mbeadh na léarscáileanna láithreáin ábhartha go léir ag gabháil leis an iarratas agus táille de €80 a chur san áireamh
- Déanfaidh an Pleanálaí measúnú ar an iarratas ansin agus déanfaidh sé cinneadh laistigh de cheithre seachtaine
- Is féidir leis an iarratasóir achomharc a dhéanamh chuig an mBord Pleanála in aghaidh an chinnidh, mar aon le táille (€210)
Find us
on Facebook
Follow us
on Twitter
Gaeilge
agus Fáilte